metrodepanama.org is an independent guide to the Panama Metro. It is not the website of Metro de Panamá, S.A. and we have no relationship with the company: we don't sell cards, we don't top them up, and we can't handle a complaint or a refund.

We bring together in one place a page for each line and each station, fares, timetables, the map and a route calculator. The site is funded by advertising.

What the October 2026 review found

On October 12, 2026 we cross-checked the entire site against what the operator publishes.

Line 3 appeared as if it were running. The status panel listed it as «normal service». The monorail toward Panamá Oeste is still under construction: in June 2026 it was around 77% complete and testing began in April; the official target is 2028, which is a goal and not a confirmed opening. It now appears as under construction everywhere, including on the map and in the PDF timetable.

The airport branch was missing. Line 2 has reached Tocumen since March 2023 via Corredor Sur and ITSE, and the homepage still said there was no metro to the airport.

Stations in the wrong order: El Ingenio and Pueblo Nuevo were swapped on Line 1, and Cerro Silvestre was out of place on Line 3. That affected the listings, the previous- and next-station links, and the calculator.

Figures: the network has 33 stations (we said 30), Line 1 is about 18 km long now that it reaches Villa Zaíta, and the commercial speed is 35 km/h, not 50.

Payments: besides the MetroBus card, you can pay contactless with a bank card, Google Pay or Apple Pay since 2023.

San Miguelito cable car: it's no longer «out to tender». It was awarded to Doppelmayr on September 3, 2026 and the Comptroller's Office endorsed the contract on October 5. It still hasn't been built.

What's live and what isn't

Nothing on this site is live. The panel only shows whether the metro is within its published hours; for incidents, the source is Panama Metro.

Where each data point comes from

Service hours, intervals and parameters: elmetrodepanama.com, consulted in October 2026.

Construction works and contract awards: Panamanian press (La Prensa, Infobae Panamá).

The map: our own schematic based on the stations' coordinates; it is not the official map and the positions are approximate.

When we get it wrong

We fix it and explain what was fixed — this page is the example. If something doesn't add up, write to [email protected].

Who is behind this site

This site is maintained by the team at GoRandom, a small group based in the Basque Country devoted to two things that go together better than you'd think: traveling and building websites.

Panama isn't yet among the cities we've set foot in — we're up to twenty and moving slowly. We'd rather say so than pretend otherwise: what you'll read here doesn't come from our memories, it comes from what the operator publishes and from verification work we can actually show.

The other half of what we do is web development, and this site is the excuse to bring the two together. We don't leave it sitting still: every price and every schedule carries its source and the date we checked it, and they're reviewed whenever the operator changes something. The last thorough review was on October 12, 2026, when we cross-checked lines, stations, fares and construction works against Panama Metro.

David Franco Aguirre — In charge of the project and what gets published on it
David Franco Aguirre
In charge of the project and what gets published on it

He's the one who decides what gets published, reviews the data before it goes out and answers the email. If you spot an out-of-date price or a schedule that no longer holds, there's a specific person to write to.