LINE 3 OF THE PANAMA METRO
Panama Metro Line 3 route
Line Three of the Panama Metro is under construction, but the stations and route it will follow in the province of Panamá Oeste are known, running along 11 stations in its first phase.
Below, you will find a list showing what the stops are:
We provide you with relevant information such as station access points, where each terminal on the line is located, nearby buses, taxis, dining, and other details for Line 3 users.
Panama Metro Line 3 West map
You can view the map of all the lines and stations. If you’d like to download it, you can do so by clicking the button below:
Line 3 stations of the Panama Metro
The planned stations for Line 3 (Phase 1) are as follows, from east to west: Albrook, Panamá Pacífico, Loma Cobá, Arraiján, Burunga, Nuevo Chorrillo, Cerro Silvestre, Vista Alegre, Nuevo Arraiján, San Bernardino, and Ciudad del Futuro.
The stations on metro Line 3 have an elevator for access by people with disabilities or those who have difficulty moving. This way, these people can move within the terminals more easily.
Line Three FAQs
How many stops will Line 3 of the Metro have?
This line will run a route of 11 stations starting at Albrook and ending at Ciudad del Futuro in its Phase 1 (first phase). A possible second phase toward La Chorrera is, for now, a future project.
How long will the Line 3 journey of the Metro take?
According to Panama Metro, the full trip between Ciudad del Futuro and Albrook will take about 37 minutes, compared to the nearly 90 minutes the trip can take today during rush hour.
What is the train interval on Line 3?
Metro de Panamá will announce Line 3 intervals and timetable before it opens; the line is not in service yet.
How many passengers will Line 3 carry?
Demand is expected to reach 20,000 passengers at peak hour and a total of 160,000 riders a day.
How far does Line 3 of the Panama Metro run?
The line runs 24.5 kilometers, of which about 5.3 km are underground.
How many cars will Line 3 of the Panama Metro have?
The fleet will be made up of 26 Hitachi six-car monorail trains.
Who is building Line 3 of the Panama Metro?
Line 3 of the Panama Metro is being built by the HPH Joint Venture Consortium made up of Hyundai Engineering & Construction, POSCO E&C and Hyundai Engineering.
When will Line 3 of the Panama Metro open?
What will the fare be on Line 3 of the Panama Metro?
How to pay the Line 3 fare
Do you need to know how to get the Panama MetroBus card? Using the button below, we provide information on how to get the regular and personalized card.
Maybe you need to check your MetroBus card balance; the button below explains how to do it through the official channels:
Other Metro lines
Here you have useful information about the other Panama lines besides Line 3. Tap the button you are interested in.
If you need to resolve any question or query about the Panama Metro, you can get in touch at the following phone number or by email.
Passenger Service phone:
504-7120
Passenger Service email:
atencionmetro
@metrodepanama.com.pa
You can submit your query Monday to Sunday and holidays (FREE OF CHARGE)
You can make your inquiry at the office located at Altos de Curundú, Avenida Ascanio Villalaz. 504-7200 P.O. Box: 0843-00045
Table of contents
